按照施工常用的检查井模具来说,其特点及构造都是围绕圆形、内径、壁厚、高度等几方面数据而言的,检查井模具,电力检查井模具,污水检查井模具厂家 而污水检查井模具的生产则是根据具体的生产方式进行下料、焊接的,所以经过不同方案的比对,比如现浇生产的混凝土污水井常常在底部割孔,而预制生产的污水井预制件则是使用连接孔(有些地方称之为堵头或者预留孔)等。这两种生产方式的不同,使得污水井模具的制作方案也就随之发生了改变了,那么具体到检查井模具特点及构造的时候,往往会依靠每个订单给出的详细说明,比如内径大小做多少、混凝土壁厚多少,每种型号的需要多少套等等,这些基本的数据在一定基础上都是相同的,只不过涉及到不同的市政管道工程或者雨污水分流工程的不同,会有不同高度的井体。不管是污水井还是其他的检查井,都是在乐丰模具的技术支持下,依靠工人的生产能力完成每个地区使用检查井模板的需求,保证每个工程的顺利开展。
According to the commonly used inspection well mould in construction, its characteristics and structure are all around the data of circle, inner diameter, wall thickness, height and so on, while the production of sewage inspection well mould is based on the specific production mode of blanking and welding, so through the comparison of different schemes, such as cast-in-place concrete production. Sewage wells often cut holes at the bottom, while prefabricated sewage wells use connection holes (sometimes called plugs or reserved holes) and so on. The difference between the two production modes makes the production plan of sewage well mould changed accordingly. When inspecting the characteristics and structure of sewage well mould, it often depends on the detailed description given by each order, such as the size of inner diameter, the thickness of concrete wall, the number of sets needed for each type, etc. These basic data are the same on a certain basis, but they involve different municipal pipeline projects or different rain and sewage diversion projects, there will be different heights of wellbore. Whether sewage wells or other inspection wells, with the technical support of Lichang Mould, depending on the production capacity of workers to complete the needs of using inspection wells template in each area, to ensure the smooth development of each project.
检查井模具的详细数据也是有着规定的,这是供检查人员或者专业设备检测的井室,大多都是不过水的,承载能力与以前的砖砌井和塑料井相比有了质的改变,而且使用混凝土一次成型的施工效率更快。排水检查井模具用的是钢模板焊接,虽然造价有了提高,相比之下,质量的改变更应该值得引起注意,钢模具的优势明显,做出来的混凝土预制产品密实度也是很高的,满足了检查井与管道衔接设计的要求,根据排水管道的大小和数量的不同所以有的时候排水井的设计也有不同,这是为了让排水的效果更好,有的还分成了上井室和下井室的组成部分,用部分带动整体的流动性更好,收水口是在井室和井圈之间的位置,作用就是调整井室内径尺寸,所以承压力也是经得住考验的。建成以后的排水检查井,我们应该经过检验合格后再使用,它的质量规格形状都应该符合规定。
Detailed data of inspection well mould are also stipulated. This is a well room for inspectors or professional equipment testing. Most of them are not water-efficient. Compared with the previous brick and plastic wells, the bearing capacity has changed qualitatively, and the construction efficiency of one-time concrete shaping is faster. The steel formwork welding is used in the mould of drainage inspection well. Although the cost has been improved, the quality change should be noticed. The advantages of the steel mould are obvious. The compactness of the concrete prefabricated product is also very high, which meets the requirements of the joint design between the inspection well and the pipeline. According to the size of the drainage pipeline. Sometimes the design of drainage wells is different because of the difference of small number and quantity. This is to make the drainage effect better. Some of them are also divided into upper and lower wellbore components. The part is used to drive the overall fluidity better. The water intake is located between the wellbore and the wellbore, and its function is to adjust the diameter of the wellbore. So pressure can stand the test. After the completion of the drainage inspection well, we should pass the inspection and then use, its quality specifications and shapes should meet the requirements.